2.11.2005
Rev. 1.5
Installation
42
The correct rotation direction is anticlockwise viewed from the motor's cooling fan end.
An arrow indicating the rotation direction is fixed to the motor on the same side where the
connection box is located.
If the rotation direction in two foregoing points is wrong, two phases of the supply cable
coming to the mains switch have to be exchanged.
Tighten the screws of the cable connections and the cable bushing properly, press the cov-
er plate of the mains switch in place, refit the electrical box cover, the upper rear plate and
the upper side plate.
5.4
Water connections
Water connections of the Proveno combi-kettle can only be carried out by a person with
professional competence in the installation and service of heating, plumbing and air con-
ditioning equipment.
The location of the water connection points appears from the installation drawing. Both
cold and hot water connections must be fitted with a closing valve and a non-return valve
(not included in delivery). The sizes of water connection points are as follows:
Cold water: connection with R1/2" inner thread, supply with min. 15 mm inlet pipe
Hot water: Cu pipe, outer dimension 10 mm, supply with 10 mm inlet pipe (max. +60°C)
If the cold water inlet pipe is smaller than 15 mm, water flow will decrease and the filling
times will be longer than indicated.
5.4.1
Flo-Ice connections (C4 option)
The location of Flo-Ice connection points appears from the installation drawing. The con-
nections must be fitted with a shut-off valve (not included in delivery).
SCE = Single Cooling Effect (without cooling mixing tool)
DCE = Double Cooling Effect (with cooling mixing tool)
All pipes from the kettle back to the icebank (Flo-Ice OUT from mixer, Flo-Ice OUT
from jacket and air vent OUT) must be individual pipes !!
Connection
Thread
Model
Flo-Ice IN to mixer
R1/2” external thread
DCE
Flo-Ice OUT from mixer
R1/2” external thread
DCE
Flo-Ice IN to jacket
R1/2” inner thread
SCE, DCE
Flo-Ice OUT from jacket
R3/4” inner thread
SCE, DCE
Pressurized air IN to jacket
R1/2” inner thread
SCE, DCE
Air vent OUT
R1/2” inner thread
SCE, DCE
Summary of Contents for PROVENO S 100
Page 2: ......
Page 4: ...2 11 2005 Rev 1 5...
Page 7: ...2 11 2005 Rev...
Page 8: ...2 11 2005 Rev...
Page 62: ...Connection diagram S00123 B3...
Page 63: ...Installation drawing L00115 B3...
Page 64: ...Text part ChillPlus L00114 A4...
Page 65: ...Steam supply recommendations 000030 A4...
Page 68: ......