2.11.2005
Rev. 1.5
Installation
44
5.5
Steam and condensate connections
The steam and condensate connections of the Proveno combi-kettle must be carried out
by a person with professional competence in the field. Improper connections and pipings
may severely impact the correct function of the kettle.
The location of the steam and condensate connection points appears from the installation
drawing.
The maximum steam pressure in the kettle is 1 bar. The steam supply line must be fitted
with a one-way valve, a shut-off valve, a filter, a pressure reduction valve and a safety
valve set at 1,5 bar.
The condensate pipe must be on the same floor as the kettle or go to the floor below. Lead-
ing the condensate pipe to the floor above the kettle is not allowed, as it creates a water
trap that prevents normal function of the kettle.
The condensate pipe must be free from pressure created by other appliances.
5.6
Ventilation
The heat and steam load of the kettle must be taken into account in the kitchen's ventila-
tion plan. A ventilation hood must be installed above the kettle, because plenty of steam
is released when the kettle lid is opened. When dimensioning the ventilation hood, the
space requirement for opening the lid must be taken into account (see installation draw-
ing).
5.7
Other installations
In case the combi-kettle being installed is provided with a self-control option, and it is tak-
en into use, the data cabling and the installation of the program must be carried out ac-
cording to a separate manual "Metos SafeTemp self-control".
5.8
Procedures after installation
5.8.1
Adjusting the tilting
Before refitting the cover plates on the combi-kettle control panel, you have to check and,
when needed, adjust the operation of tilting.
On hydraulically tilted Proveno 200 and 300 combi-kettles, first check the rotation direc-
tion of the hydraulic pump. The correct rotation direction is anticlockwise viewed from
the motor's cooling fan end. If the rotation direction is wrong, two phases of the supply
cable coming to the mains switch have to be exchanged.
Next you have to ensure that the kettle is horizontal when it is in the cooking position.
Before that make sure that the combi-kettle’s control pillar has been installed horizontally.
Checking is done as follows:
Summary of Contents for PROVENO S 100
Page 2: ......
Page 4: ...2 11 2005 Rev 1 5...
Page 7: ...2 11 2005 Rev...
Page 8: ...2 11 2005 Rev...
Page 62: ...Connection diagram S00123 B3...
Page 63: ...Installation drawing L00115 B3...
Page 64: ...Text part ChillPlus L00114 A4...
Page 65: ...Steam supply recommendations 000030 A4...
Page 68: ......