background image

SH700 Installation.docx 

Page 4 of 6 

7/6/2017 

 

Step 2 – Terrazzo Base –

 

Level the terrazzo base with a layer of mortar in case the subfloor is uneven.  

Grout any exposed edges. 

 

DO NOT drop the terrazzo base over an exposed pipe.  It is suggested that you remove the drain pipe, set the 
base down, insert the pipe through the drain in the base into the trap and then tighten with an internal pipe 
wrench. 

 

A lead caulked joint permits limited movements such as normal structural settlement without leakage. 

 

Reviews: