MI 3122 Smartec Z Line-Loop / RCD
PE test terminal
37
PE terminal test procedure
Connect
test cable to the top of the instrument.
Connect
test leads to the item to be tested (see
figures 5.18
and
5.19
).
Touch PE test probe (the
TEST
key) for at least one second.
If PE terminal is connected to phase voltage the warning message is displayed,
instrument buzzer is activated, and further measurements are disabled in Z-LOOP
and RCD functions.
Warning:
If dangerous voltage is detected on the tested PE terminal, immediately stop all
measurements, find and remove the fault!
Notes:
In the SETTINGS and VOLTAGE TRMS menus the PE terminal is not tested.
PE test terminal does not operate in case the operator’s body is completely
insulated from floor or walls!