Power Network Application Trainer Introduction
MI 3298
16
1.8.2 MI 3298 P1: Transmission Line with Pylon1
MI 3298 P1 main parts:
Figure 4-1: MI 3298 P1 training module
1. Connection point for H(C1) probe
– earth resistance (impedance)
measurements -
R
CE
2. Pylon - connection point for E(C2), ES(P2) clamp
3. Simulating of ground wire connection
4. Selection switch - selection of different resistance pylon foots earthing
condition
5. Selection switch
– selection of different earth character (resistive/inductive
type)
6. Connection for the next (neighbourhood) Training module (puzzle concept)
7.
“Soil simulation – semi-conductive material” for GPR, step and contact voltage
measurements
8. Fuse 250V T1A
9. Connection point for S(P1) clamp for ground resistance measurement
–
R
P
10. Ground terminal for the pylon
11. Connection point for H(C1) probe
– GPR, Step & Contact measurement-
R
CS
12. Pylon grounding ring simulation
13
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...