Power Network Application Trainer
– Earthing / Grounding network impedance measurement
94
4.1.2.2
Simulation of resistance earth character and broken pylon’s
foot connection
Figure 65-2: 4-pole earth measurements setup with MI 3290
Switch position
Simulated condition
Application
Expected result
Simulated broken foot Nm. 2
& 3 connection (simulated
resistive earth character),
single frequency
measurements
Industrial areas
Transformer stations
Radio towers
Pylons without ground wire
connection
Solar power plants
Wind & water turbine
Ze = 3,94
Ω @ 329 Hz, single mode
Table 20-2: Measurement setup/result for 4-pole method with simulated error
Measuring procedure:
Select proper switch position on the training module.
Measurement setup and procedure is the same as under exercise Nm. 1 (Item
4.1.1.1.2), so check the details for proper connection and select proper position of
selected switches on the training module.
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...