Power Network Application Trainer
– Earthing / Grounding network impedance measurement
96
Pylons are connected together via Ground Wire which cause that the part of the current
is completed via the ground wire link and results measured with the 4-Pole method are
not correct and different measurement method should be selected.
Switch position
Simulated condition
Application
Expected result
Regular measurement place
condition (simulated
resistance /inductive earth
character), simulated ground
wire connection
Industrial areas
Transformer stations
Radio towers
Pylons without ground wire
connection
Solar power plants
Wind & water turbine
Ze = 1.46 Ω @ 4-Pole at 329 Hz, R type
Ze = 1.48 Ω @ 4-Pole at 329 kHz, L type
Table 21-2: Measurement setup/result for 4-pole method with different test object condition
Measuring procedure
– resistance earth character
Select proper switch position on the training module:
Measurement setup and procedure is the same as under exercise Nm. 1 (Item
4.1.1.1.2), so check the details for proper connection.
Expected result:
Select proper switch position on the training module:
Expected result:
Both results are quite close to each other, but significantly smaller compared to case,
where ground wire is not connected.
Summary of Contents for MI 3298
Page 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Page 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Page 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Page 228: ...MI 3290 Earth Analyser 228 ...
Page 229: ...MI 3280 Digital Transformer Analyser 229 ...
Page 230: ...MI 3280 Digital Transformer Analyser 230 ...
Page 231: ...MI 3250 MicroOhm 10A 231 ...
Page 232: ...MI 3205 TeraOhmXA 5kV 232 ...