Power and Voltage Quality Trainer
AD 2
– MI 3399
179
o
5
th
harmonic: 15%,
o
7
th
harmonic: 15%
The Power Master MI 2892 should be connected to the Application Trainer and set up
as described in section 3.2 Instrument Setup. It is good practice to observe the
Connection Check status in the MEASRUEMENT SETUP
CONNECTION SETUP
menu. If it's marked with an OK sign ( ), you can start observing measurements.
4.6.1 Real time measurements
By entering the MEASRUREMENTS MENU
HARMONICS menu, the user can
observe the harmonics measurement in real time.
Figure 4-59: Measurement submenu
Figure 4-60: Real time measurements of voltage and current
4.6.2 Recording harmonics measurements
Basic tool for Power Quality analysis is recording parameters of an electrical system.
In this step we will create a record and observe it on the instrument, as this is a typical
case for troubleshooting.
From the MAIN MENU, enter the RECORDERS menu and then go to the GENRAL
RECORDER menu. Set up all parameters as shown in the figure below:
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...