Electrical Installation Safety Trainer
AD 1 - MI 3399
53
Typically, in a TN or TT system inside a residential building with a 1-phase system
a 6A gG fuse is used. Settings for each system are shown below
Whenever a fuse parameter setting is changed, the prospective short circuit
current (I
PSC
) limit is set automatically.
3
If a schuko commander is to be used, plug the commander into the appropriate
outlet. If the cables are used, connect all cables appropriately
– the PE cable to
the PE conductor, the N cable to the N conductor and the phase cable to a phase
conductor (L1, L2 or L3).
4
Press the
START
key.
Expected results
The prospective short circuit current (I
PSC
) is calculated as:
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...