After the trip-out time and trip-out current tests, the RCD is tripped as is the intention
of both tests. Be sure to reset the RCD before each test.
Instead of performing all three mentioned tests individually, a predefined RCD
AUTO
SEQUENCE
®
test (
RCD Auto
) can be used. The auto test performs all three test one
after another. The tester is only required to reset the RCD every time it is tripped-out
to continue testing.
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...