Power and Voltage Quality Trainer
AD 2
– MI 3399
137
Figure 3-4: Setting Nominal voltage on the instrument
3.
Exit the nominal voltage setup by pressing once the
key.
4.
Select Phase Current Clamps menu and press the
key
5.
Select A1033 Clamps and press the
key
Figure 3-5: Current clamp selection
6.
Select 100% measuring range and press the
key.
Figure 3-6: Setting Current clamps parameters on the instrument
7.
Select Neutral Current Clamps and repeat procedure above (steps 5 and 6).
8.
Select Connection menu and press the
key
ENTER
ENTER
ENTER
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...