Power and Voltage Quality Trainer
AD 2
– MI 3399
142
Figure 3-12: Setting USB communication in PowerView (PC Side)
7.
For a quick check, it is advisable to click on the Real-time Scope icon and see
if instantaneous measurements are downloaded from the instrument and
presented on the screen.
Figure 3-13: Observing waveform with PowerView
8.
Click again on the Real-time Scope icon to stop continuous download.
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...