Power and Voltage Quality Trainer
AD 2
– MI 3399
200
Figure 4-94: Observing phase switch event on the instrument
The captured waveform can be download to the PC and observed on the PC, as shown
in the figure below.
Figure 4-95: Observing phase switch event in the PowerView
4.12 Exercise 12
– Wrong instrument connection
This practical exercise will emphasize importance of right instrument connection.
Sometimes it is not possible to identify which current belongs to which voltage, and
this can lead to wrong instrument connection and faulty measurements. As there is no
post fix solution to wrongly connected instrument
– so it is very important to assure that
instrument is connected properly.
In following exercise Application Trainer will interchange some current and voltage
channel, and it to user have to find out which cables are mess up and how to connect
instrument correctly. Set switches S1 ÷ S11 on Application Trainer as shown on table
below.
Switch
Description
State
S11
Wrong instrument connection
ON
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...