Electrical Installation Safety Trainer
AD 1 - MI 3399
76
Figure 2-25: RCD measurement in the Application Trainer with the schuko
commander
Figure 2-26: RCD measurement in an IT earthing system
2.4.1.1 Function of RCD
In TN systems, fault and leakage currents flow from live conductors to protection earth
conductor and then through PEN conductor to neutral terminal of power transformer.
The RCD must trip out if the leakage (fault) current exceeds its nominal current:
I
FAULT, LEAKAGE
I
ΔN
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...