MetriCorr
VL100 & MasterLink Operation Manual
16 | 45
3.2.4
Intensive measurements
Intensive measurement
s can be enabled by marking any of the seven “Enable boxes” shown in the
screenshot below:
Intensive measurement frequency (Seconds)
Type in the interval between each measurement into this field.
Period Intensive measurements (UTC Time)
There are seven individual periods available. Each of the periods specifies a measurement to be repeated
on weekly basics; all setup is in UTC Time.
For example, three periods are enabled in the weekly schedule.
1.
Every Monday, starting at 10:15 AM, for a period of 2 hours
2.
Every Wednesday, starting 8:45 PM, for a period of 4 hours
3.
Every Thursday, starting 3:00 AM, for a period of 30 min