MetriCorr
VL100 & MasterLink Operation Manual
23 | 45
5.
Remove yellow tape from the connector (blue wire from solar panel), insert it into the solar
panel terminal marked “Panel –“
and tighten the screw terminal:
6.
Finally, check that the circular power
connector are connected to the power
socket on the MasterLink module.
Step 5: Connect the Solar Charger to the solar panel
Figure 10: Power connector