MetriCorr
VL100 & MasterLink Operation Manual
25 | 45
Figure 11: Left: Big Fink terminals. Right: Mounting brackets and Clips for Slimline Installation in Big Finks
1.
The reference electrode cable and the pipe connection(s) should be available at the top of
the Big Fink, as shown.
NB: if installing in an existing installation, additional connections (e.g., foreign pipeline,
coupon, etc.) should also be brought up so that they can be terminated correctly.