MetriCorr
VL100 & MasterLink Operation Manual
26 | 45
ER Probe Connections
(ICL module: 2 * ER probe)
(ICL-C module: 1 * ER probe)
(VL100: no ER probe)
Pipe Connection
Reference Electrode Connection
Big Fink Pole correctly installed
2.
ER probes:
Connect the ODU connectors for the ER probe cables to the ER socket(s) on
the ICL module or ICL-C module.
3.
"Pipe" & "Ref":
Connect the pipe and reference electrode cables to the logger. The
connection should be made using banana plugs (depending on the existing setup, making-
off the cable ends with banana plugs before installation of the logger may be necessary).
4.
LC input:
Connect the two wires from the pipe to "LC+" and "LC-". The connection should
be made using banana plugs as for the "Pipe" & "Ref" terminals
5.
Antenna and power cable
must be connected to the MasterLink module and go through
commissioning procedure to start the logger as outlined in
Section 3.
Figure 12: Big Fink Test Station r
eady for installation of Slimline series: “ICL & MasterLink”.
Note that “ICL
-
C & MasterLink” only takes one ER probe, Pipe connection (black), Reference (Yellow) and two
wires for pipe connections for “LC+” and “LC
-
“.