27 | 45
6.
Clips
Squeeze the clips in towards the Slimline unit and insert into
the test station, pushing down such that there is room
enough for the antenna beneath the Big Fink cap, ensuring
the cables are not excessively bent or trapped between the
logger and the side of the test post.
7.
Brackets
The logger should be lowered until the Big Fink top attached to the bracket can be correctly
seated on top of the pole. Tighten the collar nut to ensure a secure fit.
8.
All additional cables should be correctly terminated on either the standard Big Fink terminal
board (in the case of the Solar Hat Solution) or on the supplied modified (flat) terminal board
in the case of the hat battery solution.