MetriCorr
VL100 & MasterLink Operation Manual
28 | 45
The modified terminal board can be supplied, if additional connections are required, e.g in test stations
with the battery solution. Connections to the existing standard terminal board in the solar solution are
possible.
These additional connections are NOT necessary for the installation of the Slimline ICL-C since "LC+" &
"LC-", "Pipe" & "Ref" cables can be directly connected to the logger from the field without passing
through the terminal board.