13
4.
Setting-up procedures
1. Get the tester from the box and make the external inspection. Check the
complect according to the table 2.1.
2. Plug in the power supply unit to the electric network (if you use mains
voltage 110–240 V with the 50–60 Hz frequency) and to the
ETS-1000L
.
3. The device is ready in 15 second.
4. To turn off the device switch off the power supply unit.
Note:
if you want to restore default settings of the device hold the
button of a loop’s level choice (
L
) for 5 seconds. Three LEDs will
flash once for 1 second to inform you.
ETS-1000L. Operating manual
Summary of Contents for ETS-1000L
Page 1: ...ETS 1000L Ethernet Gigabit Ethernet loopback Operating manual Version 1 0 1 2009 Metrotek ...
Page 4: ...4 ETS 1000L Operating manual ...
Page 6: ...6 ETS 1000L Operating manual ...
Page 8: ...8 ETS 1000L Operating manual ...
Page 12: ...12 ETS 1000L Operating manual ...
Page 14: ...14 ETS 1000L Operating manual ...
Page 18: ...18 ETS 1000L Operating manual ...