3. Installation
page 6
ELC PE22B-PE35B V1.0-05.19-GB
Subject to technical alterations
3.1.2.
Horizontal installation position
Fig. 2:
Assembly of the ELC, horizontal installation position (all dimensions in mm).
3.2.
Power connections
L3
out1
L1 L2
L1
L2
L3
N
PE
out2
earthed lead network side
automatic cutout
cable shield
lamp feeder cable
lamp assembly
ELC
power choke
Fig. 3:
Power connections
Fig. 3 shows the electrical installation.
Operation of the ballasts requires a power
choke in series (see technical data chapter 6)
in order to limit the total harmonic distortion
of the line current to below 50%.
The lamp feeder cable shielding must be
connected to the ELC. To this end the
connector has an EMC screw connection (also
see: connection lamp cable).
If wished, the shielding can also be
connected to the lamp unit.
Mains supply cables and lamp feeder cables must be laid separately from
control cables.
501 mm
min. 150
650 mm
min. 150
261 mm
control connector
Steckerleiste für Steuersignale
Lufteintritt
air entrance
4
8
4
m
m
Lufteintritt
air entrance