© Meunier Technologies Inc. 2021 - All rights reserved
24
Normal Operation
In normal operation, the evacuation (3), separation valve (4) and calibration column (2)
valve should be in the closed position. The injection valve (1) should be in the open
position.
In normal operation, the pressure indicator reading should be the value of the pressure
set-point of the back pressure valve. If this is not the case, refer to the troubleshooting
section of the present manual.