© Meunier Technologies Inc. 2022 - All rights reserved
16
Operation
Start-up
Prior to system start-up, the responsible individuals should be informed of the safety
instructions to be followed. This manual and the Installation, Operation and Maintenance
Manual should be available at all times.
Setup and adjustment
The pressure relief and back pressure valve needs to be adjusted prior to system operation.
Pump priming
In order to help the pump priming at start-up you can unscrew the Bleed Valve (
16
) until the
fluid start flowing through the evaluation port. Once the pump is primed screw the Bleed Valve
(
16
) back in place (hand tightened); no tools should be used for tightening.