background image

 

X

4

MR

250 

 

MexAir RC 

 

 

Construction of the 

X

4

MR

 Airframe 

 

1.

 

LEDs (LED Boards supplied with this kit can be run direct to 4S LiPo power without any 
voltage regulator) 

a.

 

The preinstalled LED power leads feed through the body of the frame and exit the 
frame conveniently below the PDB position.  Do not permanently connect the power 
side of the leads to the PDB or power source at this time.  Permanent installation 
should be done after final placement of the PDB, any necessary voltage regulators, 
and speed controls.   

b.

 

Place the main frame body upside down.  First, gently push the LED wires a slight 
amount into the wire exit hole and then pull gently to see how much slack wire you 
have to work with.  Note the slack amount. Strip the remaining insulation leaving the 
amount of insulation you determined as slack.   

c.

 

Cut the excess bare wire leaving about ¼” bare.  Tin the bare end.   

d.

 

If your kit was supplied with single color wires, trace the wire from the LED location 
to the planned source end with an ohm-meter.  Mark both the positive (+) and 
negative (-) wire ends at the main body hole (the large elongated hole).  You can 
always trace the polarity later during the build if you forget to do it now.  If supplied 
with colored wires, the red (or white) wire will always be intended as the positive (+).  
The other wire is the negative (-). 

e.

 

Solder the LED board to the wires paying attention to the proper polarity.  Measure 
and cut a small strip of supplied double backed tape the same size as the LED board.  
[This is very sticky stuff!  You may want to handle it with the tip of a small hobby 
knife blade rather than your fingers.]  Apply the sticky side between the wire holes 
on the body underside.  Remove the remaining tape backing.   

f.

 

At this time you should be able to push the soldered wires of the assembly slightly 
into the body so the board will lay flat to the tape.  Readjust as necessary.   

g.

 

Verify that the bare metal of your solder joint is not touching the carbon frame body 
and the board is fully insulated from the body by the tape.   

 

 
 

 
 

Wires Fully Extended 

Partially into Body 

Insulation Stripped 

Soldered to Board 

Double Backed Tape Applied to 

Bottom of Board or Frame 

Tape Backing 

Removed, wires 

pushed into holes & 

LEDs Pressed Into 

Place 

Summary of Contents for X4MR 250

Page 1: ...Class Racing Quad airframe We specialize in the design and construction of the airframe Since the various electronic components and peripherals are widely available through many sources our focus is...

Page 2: ...me comes configured to mount the supplied Power Distribution Board with the included PDB standoffs and predrilled main frame mounting holes This PDB mount allows for piggy back mounting of a 30 5mm co...

Page 3: ...o metal screw contact surfaces especially motor mounting screws 4 Dry fit and test all electronics and FPV gear to the extent possible during the build so disassembly will not be required after you ha...

Page 4: ...ary to start tightening it back it out slightly repeating this process until the fastener is threaded to the proper depth This creates a threaded hole that should hold firmly without any other aid For...

Page 5: ...both the positive and negative wire ends at the main body hole the large elongated hole You can always trace the polarity later during the build if you forget to do it now If supplied with colored wir...

Page 6: ...ile holding the standoff in place Take care not to over tighten the standoff and shear off the screw For added assurance to prevent the screw from ever backing off a small dab of RTV Silicone Seal can...

Page 7: ...s Verify that there will be sufficient wire to reach your intended ESC solder pad locations or connector A minimum wire length of about 4 inches is necessary If not use the Surface Wire Option describ...

Page 8: ...o the arm using small tie wraps ii If using this option you may also consider surface mounting your motor ESCs directly on the arm surface Again this will additionally increase drag and turbulence and...

Page 9: ...r This will allow for soldering the motor wires later and THEN moving the heat shrink over the ESCs prior to final shrinking d TEMPORARILY place the ESCs onto the bottom plate so that the motor pads f...

Page 10: ...ole is clear of any obstruction When finally tightened this creates a very rigid frame Temporary and partial frame assembly may be desired as you progress through assembly CF Tube Standoff Configurati...

Page 11: ...piece If there is any noted slipping or twist verify that all standoff fasteners are properly tensioned f Landing Gear Installation Note Nylon landing gear can be cut to desired length i Embedded Mot...

Page 12: ...pivot with moderate force Tighten loosen the arms as necessary so that they are firmly seated but can pivot with moderate force Do not over tighten to cause excessive dimpling of the laminate or poss...

Reviews: