14
(1) Tarp - PB01
PARTS LIST CONTINUED
(1) Tower Leg- L03
(1) Tower Leg- L04
(2) Tower Leg- L05
(2) Wall Rail Board- C09
(2) Wall Rail Board- C12
43
Step 61:
Lay out and evenly space (7) Floorboards (C14) as shown. Attach the Floorboards using
(84) Screws (C2).
Step 62:
The following steps will guide you through the Ladder Assembly.