2.3
Installation in Tower Configuration
Follow the numerical sequence to assemble tower stands and tower stand expanders, shown in Figure 2-3.
Figure 2-3: Tower Configuration of Standard System and Optional Transformer Module.
E X
B R
T
E X
1 1
R
T
OFF
ON
Tower Configuration with Optional Transformer Module
Tower Configuration with Standard System
Use the same procedure
for tower mounting multiple
battery modules, if applicable.
E X B
R T
E X
1 1
R T
OFF
ON
Transformer Module
Battery Module
Power Module
Battery Module
1
1
2
2
4
4
4
4
3
3
5
1
1
2
2
4
4
4
4
3
3
5
Power Module
EX 5/7/11 RT Systems
Installation
2 — 4
86-86000-00 B01
Summary of Contents for 11+
Page 1: ...w w w m g e o p s c o m EX 5 7 11 RT Systems Installation and User Manual ...
Page 2: ......
Page 4: ... This page left blank intentionally EX 5 7 11 RT Systems iv 86 86000 00 B01 ...
Page 14: ... This page left blank intentionally EX 5 7 11 RT Systems c x 86 86000 00 B01 ...
Page 46: ... This page left blank intentionally EX 5 7 11 RT Systems 2 20 86 86000 00 B01 ...
Page 62: ... This page left blank intentionally EX 5 7 11 RT Systems 4 6 86 86000 00 B01 ...
Page 68: ......
Page 72: ...EX 5 7 11 RT Systems G 4 86 86000 00 B01 This page left blank intentionally ...
Page 74: ......
Page 75: ......