34008097EN/AB
- Page 14
2. Installation
2.7 UPS connection without a FlexPDU or HotSwap MBP module
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source and
the true electrical consumption of the total load.
Tower model
1 - Connect the UPS socket
(9)
to the AC-
power source using the power cable from the
equipments to be protected.
2 - Connect the loads to the UPS using the
cables
(32)
.
It is preferable to connect the priority loads to
the 3 outlets marked
(8)
and the non-priority
loads to the 3 outlets marked
(7)
that can be
programmed in pairs (1 and 2).
To program the outlets, the MGE UPS
SYSTEMS communications software is
required.
RT model
Note.
The UPS charges the battery as soon as it is connected to the AC-power source, even if button
(27)
is not pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
9
8
7
32
9
7
8
32
Summary of Contents for PULSAR 1000
Page 2: ...34008097EN AB Page 2...