Step 1 Unpacking
Once the Epsilon STS
TM
UPS System has been inspected and received from the shipping courier, the unit should
be moved with the use of a fork lift or pallet jack to a position as close to the final installation location as possible.
Prior to any installation, the following items should be observed upon receipt of the Epsilon STSTM 10-30 kVA UPS.
1.
Inspect shipment for any damage prior to receipt. Damage claims should be filed directly with the courier.
Replacements for damaged components should be ordered through MGE Customer Support Services at 1-800-
438-7373.
2.
Remove wrapping and foam corners to verify that the equipment nameplate (located on the inside door of the
cabinet) details a system that corresponds with the equipment ordered. See Figure QS-1.
3.
The casters on the unit will allow it to be positioned into the final installation location. At this point, the
leveling legs can be adjusted to provide a level and stable footing for the Epsilon STS™ system.
Figure QS-1
Positioning of 200A Epsilon STS™.
Epilson STS
TM
Quick Start
QS —2
86-504004-00 B03
CASTERS
LEVELING
JACKS
OPTIONAL SEISMIC
BRACKETS
SECURED USING 3/8 BOLT
Summary of Contents for STS 400A
Page 2: ......
Page 28: ... This page left blank intentionally Epilson STSTM 1 12 86 504004 00 B02 ...
Page 54: ... This page left blank intentionally Product Name 3 16 86 504004 00 B02 ...
Page 58: ... This page left blank intentionally Product Name W 4 86 504004 00 B02 ...
Page 62: ... This page left blank intentionally Epilson STSTM G 4 86 504004 00 B03 ...
Page 64: ......
Page 65: ......