Installation and User Manual
Figure QS-4
400/600A STS Input/Output Power Connections.
Step 4 Arrival of MGE Field Engineer
The MGE Field Engineer will finalize the initial Epsilon STS™ start-up. To insure a successful installation and
reliable STS service, the MGE Field Engineer will verify all of the installation connections, fusing, and then will
examine the extensive set of Epsilon STS™ personalization parameters to insure that the operation of the STS
exactly matches your installation requirements.
Quick start
QS —5
86-504004-00 B03
CONTROL WIRES
THREADED THROUGH
UNIT
CONTROL WIRE
PANDUIT/WIRE-WAYS
TOP ENTRY
CONDUIT PLATE
BRACE AT
12" INTERVALS
BOTTOM ENTRY
CONDUIT PAN
COMMUNICATION
CARDS
TB1
TERMINAL
CONTROL WIRES
CONTROL WIRE
PANDUIT/WIRE-WAYS
Summary of Contents for STS 400A
Page 2: ......
Page 28: ... This page left blank intentionally Epilson STSTM 1 12 86 504004 00 B02 ...
Page 54: ... This page left blank intentionally Product Name 3 16 86 504004 00 B02 ...
Page 58: ... This page left blank intentionally Product Name W 4 86 504004 00 B02 ...
Page 62: ... This page left blank intentionally Epilson STSTM G 4 86 504004 00 B03 ...
Page 64: ......
Page 65: ......