M
‑
I SWACO
MONGOOSE PRO Shale Shaker
17
Field Installation and Operation Manual 9092F02001AENG (D)
17
Figure 14. Side Inlet Port
Figure 15. Interior View of Control Box
a.
Three power source cables (Power Leads) inserted into Power Distribution Box
b.
Inlet port plug (Cable gland connection port)
c.
Ground location