19.
RIG-DOWN / PREPARING EQUIPMENT FOR RELOCATION
To prepare a unit for rig down or relocation, ensure the following have occurred:
•
Unit has been properly shut down (Refer to paragraph 14).
•
Unit has been properly cleaned (Refer to paragraph 16).
•
Screens have been removed (Refer to paragraph 15.3.1).
•
Unit has been disconnected from fluid piping.
•
Shipping brackets have been reinstalled (Refer to paragraph 10.2).
Once these steps are completed, the equipment is ready for transportation.