UNLOADER:
The unloader has been preset at the factory and should only be adjusted by a
trained Service Representative.
GENERATOR AND GFCI OUTLET:
This unit is equipped with a 5 Volt AC generator and a 5 Volt 5 Amp GFCI
outlet. The generator provides power to the burner, GFCI outlet, and the control
and safety circuits of the machine.
Generator:
. Always ensure the burner and auxiliary switches are in the OFF position
before starting the engine. Allow the engine to reach full RPM before turning
the burner and/or auxiliary switch(es) to the ON position. Failure to do so
can damage the generator, burner, or auxiliary equipment.
2. Do not spray water at or around generator. Electrocution and/or damage
to the generator, burner, and any auxiliary equipment may result.
GFCI Outlet:
. Always plug in auxiliary equipment after the machine has been started and
the engine is at full RPM.
2. Always turn off auxiliary equipment and unplug the auxiliary equipment from
the GFCI outlet before shutting down the machine. Failure to do so may
cause damage to the generator, burner, and auxiliary equipment.
3. Do not spray water at or around GFCI outlet. Electrocution and/or damage
to the GFCI outlet, generator, burner, and auxiliary equipment may result.
PRE-START INSPECTION PROCEDURES:
Before starting the unit, perform the following procedures:
. Check the oil level in the pump.
2. Inspect the water inlet strainer. Clean or replace if necessary. See "Water
Supply" pg. 15.
3. Check all hose connections to ensure they are securely tightened.
4. Inspect for system water leaks, oil leaks and fuel leaks. If a fuel leak is
found, DO NOT START UNIT! See "Risk of Explosion or Fire" warnings, pgs.
4-5. Be sure that all damaged parts are replaced and that the mechanical
problems are corrected prior to operation of the unit. If you require service,
contact Customer Service.
5. Inspect high pressure hoses for kinking, cuts and leaks. If a cut or leak is
found, DO NOT USE HOSE! Replace hose before starting unit. See "Risk
of Injection" warnings, pg. 6. Be sure that all damaged parts are replaced
and that the mechanical problems are corrected prior to operation of the
unit. If you require service, contact Customer Service.
END OF PREPARATION INSTRUCTIONS
UNLOADER VALVE
Summary of Contents for HDS series
Page 10: ...10 Operator s Manual HDS FEATURES HDS FEATURES 032905 RZ ...
Page 40: ...40 Manuel de l utilisateur COMPOSANTS HDS HDS FEATURES 032905 RZ Facultatif ...
Page 70: ...70 Manual del Operador CARACTERÍSTICAS HDS FEATURES 032805 RZ oPCIÓNAL ...
Page 90: ...90 Manual del Operador NOTA ...
Page 91: ...Manual del Operador 91 NOTA ...
Page 92: ...92 Manual del Operador ...