1. Product Introduction 

MRac  Pole  Rack  6  system  is  specially  designed  and  manufactured  for  large 

commercial and utility scale installations. What is more, the system can be applied to 

almost  all  PV  ground  installation  projects  in  both  open  and  rough  terrain  with 

adjustable  tilt  angles  of  0  to  60  degrees.  The  unique  locking  clamps  and  rails  also 

ensure an easier and quicker installation with simple tools. 

 

Please read this Installation Guide thoroughly before installing the MRac Pole Rack 

6 system. This Guide offers the planning and installation instruction for the system. 

 

MRac  Pole  Rack  products,  when  installed  in  accordance  with  this  guide,  will  be 

structurally adequate and meet standards of AS/NZS1170, IBC2009 and CBC 2010. 

During installation, please be sure to observe the appropriate safety regulations and 

please  pay  attention  to  the  relevant  regulations  of  your  local  region.  Please  check 

that you are using the current version of the installation manual by contacting Mibet 

Energy via mail 

sales@mbt-energy.com

or our local representatives.  

 

Get all components ready including the panels, it will take around one hour and a 
half for 4 well trained workers to finish the installation of one set of Pole Rack 6. 

 
The installer is solely responsible for: 

 

  Complying  with  all  applicable  local  or  national  building  codes,  including  any  that  may 

supersede this manual; 

  Ensuring that MRac and other products are appropriate for the particular installation and the 

installation environment; 

  Using only MRac parts and installers-supplied parted as specified by MRac (Substitution of 

parts may void the warranty and invalidate the letter of certification on page 2); 

  How to recycle: according to the local relative statute; 

  How to disassemble: countermove with installation; 

  Ensure that there are no less than two professional workers in panel installation; 

  Ensure  the  installation  of  relative  electrical  equipment  is  performance  by  professional 

electrician.  

  Ensure safe installation of all electrical aspects of the PV array. 

Summary of Contents for MRac Pole Rack 6

Page 1: ...592 3754999 Xiamen China 361022 Fax 86 592 6771575 www mbt energy com Email sales mbt energy com 1 9 MRac Pole Rack 6 Installation Guide Content 1 Product Introduction P2 2 Installation Tools Components P3 3 Installation Instruction P4 4 10 Years Warranty Declaration P7 ...

Page 2: ...e pay attention to the relevant regulations of your local region Please check that you are using the current version of the installation manual by contacting Mibet Energy via mail sales mbt energy com or our local representatives Get all components ready including the panels it will take around one hour and a half for 4 well trained workers to finish the installation of one set of Pole Rack 6 The ...

Page 3: ...allation Tool 4 6mm Inner Hexagon Spanner 2 5m Tape 4 12 Spanner 2 2 Main Components Components End Clamp Kit Inter Clamp Kit C Clamp Kit Rail 50 Adjustable Tube Connector Adjustive Pole Beam Built in Fitment for Beam Splice for Post Girder PR 6 Quadrate Post 2 3 Solution Overview 1 End Clamp Kit 2 Inter Clamp Kit 3 C Clamp Kit 4 Rail 50 5 Beam 6 Built in Fitment for Beam 7 Girder 8 Adjustable Tub...

Page 4: ...lice for Post 11 PR 6 Quadrate Post 3 Installation Instruction 3 1 Install PR 6 Quadrate Post 3 1 1 Dig a hole depth at 1200 1500mm with dimension around 600 700mm leaving graves at the bottom around 70mm 3 1 2 Put the PR 6 Quadrate Post into the hole directly input mud fluid into this hole while make sure perpendicularity error of the Post is within 2 3 2 Install Splices for Post and Girder ...

Page 5: ...t energy com Email sales mbt energy com 5 9 3 2 1 Fix two Splices for Post onto the Quadrate Post by two sets of Hexagon Bolts M14 150 as Picture 3 2 1 shows 3 2 2 Put the Girder between the two Post Splices fix it with M14 150 Hexagon Bolts as planned Refer to picture 3 2 2 3 3 Install Adjustive Pole and PR 6 Beam 3 2 1 3 2 2 ...

Page 6: ...ith 10 20 30 40 50 and 60 degrees at your disposal Tips To make an easier assembling installation for the rest components the tilt angle of system can be changed to 10 degrees firstly connecting the Girder onto the hole of Adjustive Pole at the top 3 3 3 Fix Built in Fitments for Beam onto the Girder with two sets of Hexagonal Bolt M12 75 respectively making sure they are located symmetrically Ref...

Page 7: ...lace all other Rail 50 as planned Tips Make sure all rail ends are in the same line that is The distance between ends of 4 Rails and the side part of Beams should remain the same 3 5 Install solar Panels 3 5 1 Install the panels as planned Put panels onto the Rail 50 and fix them with Inter Clamps Kits and End Clamps Kits Tips Put one Inter Clamp between two panels remove it after the panels fixed...

Page 8: ...allation of the Product is not performed in accordance with Mibet s written installation instructions or if the Product has been modified repaired or reworked in a manner not previously authorized by Mibet IN WRITING or if the Product is installed in an environment for which it was not designed Mibet shall not be liable for consequential contingent or incidental damages arising out of the use of t...

Page 9: ...ke a claim against us directly In order to make a claim against us you must post fax or email us a notice using the contact details set out below In your notice you must provide details of why you believe the Frame is defective a copy of your invoice receipt or any other document which provides proof of purchase Details of any expenses you have incurred in making your claim and details of how we s...