Page 100
Appendix | Accessories
thermoMETER CT
A 1.4.7
Accessories for Massive Housing
Fig. 53 Air purge collar for massive housing
(thread M18x1) [TM-APMH-CT]
Fig. 54 Mounting bracket for massive housing, ad-
justable in one axis [TM-FBMH-CT]
The needed amount of air (approx. 2 ... 10 l/ min.) depends on the application and the installation conditions
on-site.