Adjustment and Maintenance
4
cover to the cart, observing the position of the post. Gently lift the cover off,
being careful not to damage the wires connected to it.
To remove the V-plate, the test mass must be partially disassembled. First,
note the orientation of the top part of the test mass and the V-plate. It is very
important to replace these parts in the same orientation. Remove the three
beryllium copper M3 screws that secure the top part of the test mass to the
three posts which pass through the V-plate. Now the lower portion of the
mass can be lowered through the V-plate. Remove the six M2 screws holding
the V-plate to the cart.
Reverse the procedure to replace the plate.
The tungsten balls from which the test mass is held are part of the top hat
assembly. If these balls need replacement, send the entire mass assembly to
Micro-g Solutions for installation and rebalancing. Reassemble the test mass
using the three beryllium copper M3 screws, and pack it carefully before
shipping. All the pieces must be included for the balancing to be done
correctly.
4.1.1.7.Replacing the Linear Bearings
The chamber must be vented and opened for this procedure. If possible, use
dry nitrogen to vent the chamber.
Remove the drive belt as described previously. Loosen the three M6 screws
in the split clamps on the top rod ring and remove the top rod ring.
Remove the upper bumper stop assembly from the rod by removing both
retaining rings from the rod. Remove the ribbon cable wires connected to the
cart. Remove the ribbon cable clamp on the cart, and gently lift the cart off
the guide rods.
4-5
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...