Adjustment and Maintenance
4
4.5.4.Maintenance
Schedule
To keep the instrument at its optimum performance level proper maintenance
procedures should be periodically performed.
4.5.4.1.Annually
Inspect, replace, and adjust the cart drive belt.
Inspect, replace, and lubricate the drive system bearings.
Inspect and replace the tungsten support contacts on the test mass and cart.
Reassemble the vacuum system and test for leaks. Pump down and bake out
the vacuum system.
Test and adjust the system electronics.
Clean and align the optics.
4.5.4.2.Semi-annually
Calibrate the He-Ne laser to an iodine standard.
4-44
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...