M
EASURE
S
ATURATION
P
RESSURE
Unit [n] > Start p° Measurement
In 21CFR11 environments, users are required to login to the Confirm application to
start an analysis. Once the analysis window is opened, manual control is disabled
until the analysis has completed. During analysis, pausing and resuming is allowed,
however, steps cannot be skipped.
Starts a saturation pressure measurement.
Gemini Model
Description
2390a
p° can only be measured in the sample tube, therefore selections are
not provided. Verify that a sample tube is attached to the sample port
and that it does not contain a filler rod. Click
Start
.
2390p and 2390t
A p° tube is installed on these models. p° can be measured in the p°
tube or in the sample tube. If using a sample tube, ensure that a
sample tube is attached to the sample port and that it does not con-
tain a filler rod. Click
Start
.
After analysis, go to
Unit [n] > Unit Configuration
. The recorded value now displays in the
Last
Measured Po
field.
Measure Saturation Pressure
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021
5 - 19
Summary of Contents for GEMINI VII
Page 1: ...OPERATOR MANUAL 239 42828 01 May 2021 Rev H GEMINI VII SURFACE AREA ANALYZER ...
Page 10: ......
Page 16: ......
Page 92: ......
Page 126: ...6 About Reports SAMPLE LOG REPORT 6 34 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Page 127: ...T PLOT REPORT t Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 35 ...
Page 128: ...6 About Reports VALIDATION REPORT 6 36 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Page 234: ......
Page 242: ......
Page 244: ......
Page 247: ......
Page 248: ......