![background image](http://html1.mh-extra.com/html/micromeritics/sedigraph-iii-5120/sedigraph-iii-5120_installation-instructions-and-checklist_1787652037.webp)
SediGraph III 5120 Installation
Installing the Analysis Program
Mar 2010
33
Installing the Analysis Program
Preparing Analysis Fluids
Insert the air filter in the drip tray.
P F N/A
Level the analyzer.
P F N/A
Place the PUMP CONTROL switch in the AUTO position.
P F N/A
Place the SediGraph power switch in the ON position.
P F N/A
Turn on the computer, monitor, and printer.
P F N/A
Connect the power cable to the analyzer and to a power source.
P F N/A
Turn the X-ray key to the X-ray ON position.
P F N/A
Make sure the green light on the analyzer turns on.
P F N/A
Make sure the fans are running.
P F N/A
Allow the analyzer to warm up for 30 minutes before starting the
verification procedure.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Install the SediGraph analysis program and load calibration files.
P F N/A
Start the analysis program.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Make the proper solution of sodium metaphosphate and de-ionized water
and place in rinse container.
P F N/A
Insert the rinse, waste, and overflow tubes into the appropriate
containers.
P F N/A
Perform a baseline measurement.
P F N/A
Procedure
Evaluation
Code
Initial/
Date