![background image](http://html1.mh-extra.com/html/micromeritics/sedigraph-iii-5120/sedigraph-iii-5120_installation-instructions-and-checklist_1787652038.webp)
Installing the MasterTech 052 (Optional)
SediGraph III 5120 Installation
34
Mar 2010
Installing the MasterTech 052 (Optional)
Verifying Operation
Procedure
Evaluation
Code
Initial/
Date
Remove the packing material.
P F N/A
Select the line voltage.
P F N/A
Install the fuse(s).
P F N/A
Turn on the MasterTech.
P F N/A
Install the beaker tray.
P F N/A
Connect the cable from the SediGraph to the MasterTech.
P F N/A
Install the ultrasonic probe.
P F N/A
Install the sample transfer tubing.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Test the SediGraph elevator assembly.
P F N/A
Test the cell pump.
P F N/A
Test the mixer pump.
P F N/A
Test the air valve
P F N/A
Test the waste valve
P F N/A
Test the rinse valve
P F N/A
Test the MasterTech operation (if installed).
P F N/A