2 I
NSTALLATION
The following are required for safe installation and prep station operation:
n
The installation location must be in an area that is easily accessible from all sides for servicing
and operating.
n
The power cable should be connected only to a suitable wall outlet.
n
Gas cylinders should be placed within 6 ft of the degasser. The same gas cylinder can be used
for both the prep station and the instrument by using a tee fitting on the gas supply line.
n
The degasser uses up to 50cm
3
/min of inert gas and does not require special ventilation, how-
ever ensure that the installation location provides adequate ventilation space near the back of
the instrument.
n
Use of fuses other than those specified may cause damage to the equipment. See
n
Only inert gasses (helium, nitrogen or argon) should be used for sample preparation. Inert
gasses in the quantities used by the degasser do not pose a health hazard to users.
U
NPACKING AND
I
NSPECTION
When the equipment is received, unpack and inspect the contents of the shipping container(s).
Use the packing list to verify that all products, accessories, software (if applicable), and
documentation are received intact and in the correct quantity. The shipping container(s) and
contents should be inspected within a few days of receipt in the event damage or loss has
occurred. Sort through all packing material before declaring missing equipment or parts.
Micromeritics recommends saving all shipping containers until installation of the equip-
ment is complete. All shipping containers where equipment is to be declared as dam-
aged or lost must be examined by the claims investigator prior to completion of the
inspection report.