2 Installation
S
ELECT THE
V
OLTAGE
1. Pull the voltage selector card straight out of the power connector housing. If necessary, use
needle-nose pliers to grasp the card.
A. Housing
B. Power switch
C. Power connector
D. Voltage selector card
E. Fuse holder
F. Fuse cover
G. Fuse setting indicator
2. Set the voltage:
a. Position the selector card so that the required voltage is readable at the bottom and the
selector pin is pointing up.
100V
120V
230V
240V
3. Insert voltage selector card into the housing. The printed side of the card must face toward
IEC connector and the edge displaying the voltage goes in first.
4. Replace the fuse cover.
5. Verify that the indicator pin shows the required voltage.
2 - 8
VacPrep Operator Manual
061-42802-01 (Rev B) — Apr 2021