background image

Installing the Workstation 5 Adjustable Stand 

 

MD0013-004

Page 1 of 2

This document describes how to install 
the Workstation 5 Adjustable stand and 
the optional Printer Power Supply.

1. Install the optional Printer Power 

Supply, if required. Refer to Figure 
1. 
Open the power supply 
compartment door and attach the 
AC power connector to the power 
supply. Close the compartment 
door.

2. Install the Optional LCD Customer 

Display if required. Installation 
instructions are provided with the 
display.

3. Refer to Figure 2 and prepare the 

workstation for mounting on the 
stand.

4. Connect the AC Power Cable 

supplied in the Workstation 5 loose 
parts kit to the AC receptacle in the 
base of the stand.

5. Cable the workstation. A pair of re-

usable tie-wraps supplied with the 
stand can be used to bundle the 
cables if required. Figure 2. 

6. Before placing the unit on the stand, 

make sure the locking latches are 
unlocked and the I/O door is closed 
as shown in Figure 2.

 Figure 1: Installing the Optional Printer 

Power Supply 

 Figure 2: Preparing to Install the 

Workstation 

Reviews: