8.1 User information
Before you connect the myDatalogEASY V3 and place it into operation, you must observe and comply with
the following user information!
This manual contains all information that is required for using the device.
Is intended for technically qualified personnel who have the relevant knowledge and experience in the area of
measurement technology.
Read this manual carefully and completely in order to ensure the proper functioning of the
myDatalogEASY V3 .
Contact Microtronics Engineering GmbH(see "Contact information" on page 277) if anything is unclear or if
you encounter difficulties with regard to installation, connection or configuration.
8.2 Applicable documents
In addition to this operating instructions, additional instructions or technical descriptions may be required for
the installation, commissioning and operation of the entire system.
These instructions are enclosed to the respective additional devices or sensors or are available for download
on the Microtronics website.
8.3 General principles
The entire measurement system may only be placed into operation after completion and inspection of the
installation. Study the manual thoroughly before placing into operation to prevent faulty or incorrect
configuration.
Utilise the manual to familiarise yourself with the operation of the myDatalogEASY V3 and the input screens
of the myDatanet server before you begin with the configuration.
8.4 Commissioning the system
Note:
It is recommended that the myDatalogEASY V3 is first placed into operation in the office before
mounting the device permanently at the place of use. During this process, you should create a site for the later
operation on the myDatanet server (see "Creating the site" on page 107) and determine a site configuration
(including Data Descriptor and Device Logic) (see "Site configuration" on page 82). If you create the site based
on an IoT application (see "myDatanet Server Manual " 805002), the Data Descriptor and Device Logic are
taken from the IoT application and do not need to be defined separately. Take the opportunity to get to know the
functions of the device in a stable environment. You can also use suitable test signals to simulate the sensors
to establish the optimum configuration of the myDatalogEASY V3 prior to its actual first use. This reduces the
amount of time required for on-site installation to a minimum.
Rev. 05
77
Summary of Contents for myDatalogEASY V3
Page 2: ......
Page 13: ...Chapter 2 Declaration of conformity Chapter 2 Declaration of conformity Rev 05 13 ...
Page 14: ......
Page 42: ......
Page 76: ......
Page 88: ......
Page 102: ......
Page 110: ......
Page 116: ......
Page 234: ......
Page 244: ......
Page 252: ......
Page 254: ......
Page 266: ......
Page 276: ......