4. If the connection cable is considerably longer than required to position the pressure sensor in the
required installation position, you can roll up the excess part of the cable within the cable holder of the
mounting fixture. The cable holder can hold up to 3m of cable. Roll up the cable in a clockwise direction.
Start in such a way that the cable runs from the tension clamp towards the left upper bracket and the
circle then continues towards the right upper bracket.
Important note:
When rolling up the cable, it must be ensured that the bend radius does not
fall below the minimum permissible value of 60mm .
Rolling up the connection cable
1
Cable holder
2
Bracket
54
Rev. 01
Summary of Contents for myDatalogGauge 3G
Page 2: ......
Page 10: ...2 2 BLE Gauge 10 Rev 01 ...
Page 11: ...Chapter 2 Declaration of conformity Rev 01 11 ...
Page 12: ......
Page 13: ...Chapter 3 Ex certification Chapter 3 Ex certification 3 1 BLE 3G Gateway ATEX Rev 01 13 ...
Page 14: ...14 Rev 01 ...
Page 15: ...Chapter 3 Ex certification Rev 01 15 ...
Page 16: ...16 Rev 01 ...
Page 17: ...Chapter 3 Ex certification 3 2 BLE Gauge Rev 01 17 ...
Page 18: ...18 Rev 01 ...
Page 19: ...Chapter 3 Ex certification Rev 01 19 ...
Page 20: ...20 Rev 01 ...
Page 134: ......
Page 140: ......
Page 152: ......
Page 154: ......