Step 1. – Pre-Installation Inspection
Inspect all of the components that you received with your unit. You should have received the
following:
1. Fleck 5810 XTR2 Control Valve
2. Media Tank
3. Upper Screen
4. Bypass Assembly w/ Bypass Valve and
1” NPT Connector Yokes (2)
5. Riser tube and lower distributor
6. Bag or box of gravel
7. Bag(s) or box(es) of NextSand media
8. Funnel
9. Drain Line Flow Control - DLFC
(attached to #1)
Step 2. – Selecting an Installation
Location
While exterior installation in warm climate
areas is possible, we strongly recommend
interior installation only. The system cannot
be allowed to freeze or severe system
damage could occur. The system should not
be exposed to rain and it should not be
installed in direct sunlight, as long-term exposure to UV light could damage components of
the system. Furthermore, direct sunlight could raise the internal water temperature in the
treatment tank and reduce backwash effectiveness.
In most cases, the system should be located AFTER your water pump and pressure tank(s)
and BEFORE all other water treatment equipment and your hot water heater.