Example:
L
TR
= L
1
+L
2
L
1
= depth in concrete of TR8 – please refer to section 6 INSTALLATION – CEILING UNIT or
height of the wooden beam
L
C
= depth in concrete of lifting mechanism – please refer to section 6 INSTALLATION –
CEILING UNIT
L
2
=L – 55mm
L
3
= distance above wooden beam. Due to security buffer minimum 40mm.
Practical example CONCRETE:
Lower ceiling is 150mm below the main concrete. Concrete type is C25/30. (see
concrete types and strengths
in 6 INSTALLATION – CEILING UNIT).
L=150mm
L
1
=40mm
L
2
=150-55mm; L2=95mm
L
TR
= L
1
+L
2
; L
TR
=40+95=135mm
Maximum length of the 4 threaded bars is 135mm.
Practical example WOODEN BEAM:
Lower ceiling is 150mm below the main wooden beam. Wooden beam is
100x100mm.
L=150mm
L
1
=100mm
L
3
=40mm
L
2
=150-55mm; L2=95mm
L
TR
= L
1
+L
2+
L
3
; L
TR
=100+95+40=235mm