8.
Bring the DRY SIREN box with ceiling unit in it under the spot where it will be installed. Take
supplied rope (part number 15) and fix it step-by-step onto the lifting mechanism and DRY
SIREN ceiling unit. Please take the hitch and fix it into the clip (1) of the Back lift assembly (part
number 13). Untangle the rope and with the other end continue through the lifting mechanism
of ceiling unit (2). Continue guiding the end of the rope through the wheel of Back lift assembly
(3) out in direction of Front lift assembly (4).
Please make sure that the rope is correctly guided
through the locking mechanism (5).
Pull the rope towards yourself until the rope is tight. Do
not lift the ceiling unit yet. Rope is 14.5m long, you can thus use it for a maximum ceiling-to-
floor distance of 4.5m.
1
2
3
4
5
9a.
Perform test of lifting mechanism. Please note that a force of 500N
is required to pull the ceiling unit effectively up to the ceiling. A person
performing the task must weigh minimum 70kg. A person with lower
weight may be outweighed by the weight of the ceiling unit and
accident may occur with result in person’s injury and unit’s damage.
500N
min. 70kg
Max. ceiling
height 4.5m