SW
IM
M
IN
G
P
O
O
L
D
EH
U
M
ID
IF
IE
R
D
R
Y
S
IR
E
N
15.1
INSTALLATION CHECK-LIST AND WARRANTY CARD
FOR THE INSTALLER:
After the installation please go through below check-list. Fill it in, sign, stamp and hand over to
customer please.
Ceiling unit fixed and secured with hooks
and clips (total 8x)
YES NO
Eventual disruptions in vapor barrier fixed.
Vapor barrier not disrupted.
YES NO
Condensate drain of ceiling unit installed
correctly (max. 20cm upward, then declivity,
no waving, no elevation; end by siphon)
YES NO
Electrical connection done OK
YES NO
Refrigerant connection done OK
YES NO
Leak test performed without leakage(s)
detected
YES NO
System vacuuming performed
YES NO
Connecting refrigerant distance
…………………………………… meters
Final refrigerant charge
……………………………………kg R410A
Mobile application successfully paired and
tested
YES NO
Bluetooth speaker successfully paired and
tested
YES NO
Date: ……………………………………………………
Name:…………………………………………………..
Company stamp:…………………………………………………………. Signature:…………………………………………
SWIMMING POOL DEHUMIDIFIER DRY SIREN
MANUFACTURER: MICROWELL, SPOL. S R.O., SNP 2018/42, 92701 SALA, SLOVAKIA.
www.microwell.eu
,
export@microwell.sk
.