24
6.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Summary of Contents for 9V SERIES
Page 13: ...11 4 Refrigerant Cycle Diagram Cooling only Heat pump mode...
Page 14: ...12 5 Wiring Diagram 5 1 Indoor Unit Cooling only...
Page 15: ...13 Cooling Heating...
Page 16: ...14 5 2 Outdoor Unit Smaller than 18K model Cooling only...
Page 17: ...15 Cooling Heating...
Page 18: ...16 For 18 K model Cooling only...
Page 19: ...17 Cooling Heating...